A highway realignment project in Estonia originally specified mechanically stabilized earth (MSE) panels for the bridge abutments, but was value engineered with Redi-Rock. In spite of design challenges, the project was completed four weeks ahead of schedule. https://rr.direct/trb4
Hamilton County, Ohio, saved $40,000 by choosing Redi-Rock XL over cast-in-place walls for tall abutments due to reduced labor requirements. Work progressed despite freezing temperatures, saving weeks on construction. https://rr.direct/trb5
Colorado DOT specified headwalls and wingwalls with exacting demands: aesthetics, flood protection, accommodation of three utility lines, and quick construction. Built in compliance with AASHTO and LRFD standards, the rapid installation of Redi-Rock allowed the project to finish on time and on budget. https://rr.direct/trb6